Data / Renewables · Germany
Renewable buildout by region
All 6,574,299 solar, wind, biomass and hydro units in operation in the official register, plus the pipeline. Filter by technology, size, region, operator, grid level and more, in net or gross capacity; every view can be shared as a link or downloaded as CSV.
- Export
- 17 Nov 2026
- Coverage
- 6,574,299 units · 215.9 GW net · 231.4 GW gross in operation
- Refresh
- Weekly, automatic
The newest data is days old. This dataset normally refreshes within 10 days, so the automatic refresh may have stalled. Data status
Open data: Download these tables (Parquet, CSV) on Hugging Face
Key insights · 17 Nov 2026
What the register says
- Solar · January to November 202615.1 GW
of solar (module peak) was commissioned this year, down 5% on the same months of 2025. Ground-mounted parks are 52% of it.
See solar this year → - Onshore wind · January to November 20264.71 GW
of onshore wind went into operation this year, up 6% on the same months of 2025, from 879 turbines averaging 5.4 MW.
See onshore wind → - Fields versus roofs52%
of new solar capacity in 2026 is ground-mounted, against 29% in 2020. Rooftop additions in 2025 were down 23% on 2023.
Compare solar segments → - Balcony solar1,561,194
plug-in solar units are registered, 358,575 of them in 2026: 46% of all new solar units, but only 2.1% of new solar capacity.
See balcony solar → - Solar plus storage79%
of new rooftop systems under 30 kW in 2026 have a battery registered on site, against 53% in 2020. Home solar is now mostly sold with storage.
See rooftop solar with batteries → - A north–south split62%
of onshore wind capacity stands in five northern and eastern states (Niedersachsen, Schleswig-Holstein and others), while Bayern and Baden-Württemberg host 39% of all solar but only 7% of onshore wind.
Open the map → - Offshore wind11.7 GW
of offshore wind is in operation in the North and Baltic Seas. 1.96 GW of it, in 143 turbines, was commissioned in 2026.
See offshore parks → - Wind pipeline54.0 GW
of onshore wind is registered as in planning (8,736 turbines), 75% of today’s onshore fleet. Permitted turbines must be registered, so wind’s pipeline is better covered than solar’s.
Open the pipeline → - Turbine makers · 202531%
of new onshore wind capacity in 2025 came from Nordex. The top three makers supplied 91%.
See turbine makers → - Read recent months with care81 days
pass before 90% of rooftop solar units are registered (median 8 days); for onshore wind it is 22 days. The latest two months always look weaker than they will end up.
See this year →
Explorer
Slice the buildout
Loading the register data…
More filters (10)
01
Every district
Capacity by Landkreis. Per km² shows where the landscape changes; per inhabitant shows who generates more than they use. Click a district for its breakdown. Follows status, period, technology, capacity basis and Bundesland.
All renewables
Offshore wind is not assigned to districts. Population and area: Destatis, 31 Dec 2024.
Source Marktstammdatenregister (BNetzA), export 2026-11-17; boundaries © GeoBasis-DE / BKG 2026 (data changed); © Statistisches Bundesamt (Destatis)
02
Over time
Capacity added each year and month, and the installed fleet at each year end. Colours follow the technology group, or the technology when one group is selected.
03
Technologies
Rooftop, ground-mounted, balcony and other solar; onshore and offshore wind; biomass and hydropower.
04
Size bands
Distribution by net rated power per unit. Ignores the size filter so you always see the full spread.
05
Bundesländer
Where the capacity stands, absolute and per inhabitant and km². Click a state to filter.
06
Characteristics
Grid, market and design attributes from the register. Click any bar to filter the whole page.
07
Landkreise
District view, with capacity per inhabitant and per km². Click a district to show it on the map. Follows status, period, technology and Bundesland.
08
Wind turbines
Turbine makers in the current view, and how big new onshore turbines have become.
09
Operators
Organisations that operate units: utilities, project companies, cooperatives, municipalities. Private persons are not named in the register. Follows status, period and technology.
10
Grid operators
The grid operator each unit is connected to. Follows status, period, technology and Bundesland.
11
Largest parks and units, one by one
Every wind park and every other unit of 5 MW or more, latest first. Wind turbines are grouped into parks by park name, district and operator. Follows status, period, technology, Bundesland, size, voltage, tender and turbine maker. Names are as registered.
Method
How these numbers are built
Pull
Every Monday a scheduled job reads the needed files of the MaStR full export from the BNetzA server: solar, wind, biomass and hydro units, their EEG records, grid connection points and market actors.
Join
Each unit gets its grid connection (voltage level, grid operator), its operator type (organisation names only; private persons stay anonymous) and, from 300 kW, whether it won an EEG tender.
Clean
In operation (including temporarily shut down) or in planning. Left out: 7 without capacity, 68 with implausible capacity, 0 in operation without a commissioning date. Units shut down for good only feed the history chart.
Classify
Solar type as registered (building, ground-mounted, plug-in), wind on land or at sea. Places from the official municipality key, mapped to the district boundaries of 1 Jan 2026; offshore wind sits in the exclusive economic zone.
Net or gross
Net rated power (Nettonennleistung) is the grid-side output; gross (Bruttoleistung) the generator or module rating. For solar, gross is the module peak power used in BNetzA’s headline statistics; net is capped by the inverter.
Data: Bundesnetzagentur, Marktstammdatenregister, export of 17 Nov 2026, licensed under Datenlizenz Deutschland – Namensnennung – 2.0. Boundaries © GeoBasis-DE / BKG 2026 (data changed); © Statistisches Bundesamt (Destatis). Recent months are incomplete because of late registrations. Planned units are only those registered early. Scripts: scripts/data/. Built 2026-11-18.
Validation
Checked against the official statistics
Gross capacity in operation at the end of September 2026, from this explorer’s data, against the BNetzA, EE-Statistik September 2026 (MaStR evaluated 13 Oct 2026) (gross, including temporarily shut-down units, registered units only). Our export is newer, so late registrations add a little.
| Technology | This explorer, MW | BNetzA, MW | Difference | This explorer, units | BNetzA, units | Difference |
|---|---|---|---|---|---|---|
| Solar, total | 131,139 | 130,675 | +0.4% | 6,411,650 | 6,395,688 | +0.2% |
| Solar, building-mounted | 82,432 | 82,200 | +0.3% | 4,862,078 | 4,846,106 | +0.3% |
| Solar, ground-mounted | 46,981 | 46,746 | +0.5% | 19,970 | 19,834 | +0.7% |
| Solar, plug-in (balcony) | 1,667 | 1,671 | −0.3% | 1,529,468 | 1,529,612 | −0.0% |
| Onshore wind | 71,199 | 71,267 | −0.1% | 30,440 | 30,494 | −0.2% |
| Offshore wind | 11,599 | 11,539 | +0.5% | 1,815 | 1,811 | +0.2% |
| Biomass | 9,195 | 9,264 | −0.7% | 22,032 | 22,067 | −0.2% |
Hydropower is not in BNetzA’s monthly statistic; AGEE-Stat reports about 5.4 GW for the end of 2025, including pumped storage with natural inflow. BNetzA’s “Nettozubau” means additions minus final shutdowns, still in gross capacity, not net rated power.
Glossary
What the labels mean
- Units
- Registered generating units. One rooftop system is usually one unit; a wind park has one unit per turbine.
- Net capacity
- Net rated power (Nettonennleistung): the maximum continuous output at the grid side. For solar it is capped by the inverter.
- Gross capacity
- Gross power (Bruttoleistung): the generator or module rating. For solar this is the module peak power (kWp), the basis of BNetzA’s headline figures.
- Gross ÷ net
- Gross divided by net capacity. Solar arrays are often sized above their inverter, so the ratio is above 1.
- In planning
- Units registered with the status “in planning”. Registration before commissioning is optional for most units, so the real pipeline is larger; not every project will be built. Wind is better covered.
- Registration lag
- Days between commissioning and registration. The latest months always look weaker than they will end up.
- Bundesland
- Federal state, from the official municipality key of the unit. Offshore wind sits in the exclusive economic zone (EEZ) and is its own row.
- Operator type
- Who runs the unit. Organisations include companies, utilities, cooperatives and municipalities. Private persons stay anonymous in the register.
- Feed-in mode
- Self-consumption first: the site uses its own power and exports the surplus. Full feed-in: all output goes to the grid.
- Remote control
- Whether the grid operator and/or a direct marketer (for example a virtual power plant) can control the unit remotely, as registered.
- Voltage level
- Grid level of the connection point. Rooftop solar connects at low voltage; parks and wind farms at medium, high or extra-high voltage.
- Tender award
- The unit won a federal EEG tender (Ausschreibung). Tenders apply from 750 kW for solar and to almost all new wind; smaller units get a fixed feed-in tariff.
- Usage sector (solar)
- Where the solar system is used, as registered: households, commerce & services, industry, agriculture, public buildings. Solar only.
- Orientation (solar)
- Main direction the modules face. East-west systems produce a flatter daily profile; south maximises yearly output. Solar only.
- Battery on site (solar)
- Whether a battery is registered at the same location as the solar system. Solar only.
- Turbine maker (wind)
- Manufacturer as registered, with predecessors merged into today’s brands (REpower → Senvion; Tacke, Enron Wind → GE; Siemens, Gamesa, Bonus, Adwen → Siemens Gamesa; NEG Micon → Vestas). Wind only.