Data / Smart meters · Germany
Smart meter rollout radar
3.68 million solar and battery sites are legally due a smart meter. This radar shows where they are, which default meter operator serves them and how far it has got, by district, operator and postcode. Filter by segment, commissioning date, battery and owner; every view can be shared as a link or downloaded as CSV.
- Register export
- 17 Nov 2026
- Quotas
- H1 2026 (history from Q4 2024)
- Refresh
- Weekly, automatic
The newest data is days old. This dataset normally refreshes within 10 days, so the automatic refresh may have stalled. Data status
Open data: Download these tables (Parquet, CSV) on Hugging Face
Key insights · 17 Nov 2026
What the register and the quotas say
- Legally due3.68 million
sites in operation are mandatory smart meter cases (solar above 7 kW, or a battery from 2024 above 4.2 kW). An estimated 2.76 million of them still have no smart meter, judged by their default operator’s reported quota.
See the map → - Deadline end of 2026806,839
mandatory sites went into operation since 25 Feb 2025. The law wants 90% of them equipped by the end of 2026; at today’s quotas about 600,314 are not. Until it gets one, new solar is capped at 60% feed-in (Solarspitzengesetz).
Show new sites only → - Below the legal minimum22%
of mandatory sites sit in the areas of 339 default operators that had equipped less than 20% of their mandatory cases by H1 2026. Their customers may pick a competitive operator instead.
Show these areas → - Densest gap121
mandatory sites without a smart meter (estimated) per 1,000 inhabitants in Straubing-Bogen, the most of any district; Dingolfing-Landau and Rottal-Inn follow. Germany’s average is 33.
Map per inhabitant → - Momentum, Q4 2025 → H1 2026+22.5 pts
Stadtwerke Ostmünsterland GmbH & Co. KG raised its quota the most among operators with 5,000+ mandatory sites, to 39.0%. Thüga Energienetze GmbH moved least (−6.9 pts, now 14.9%).
Compare operators → - Bundle potential48%
of mandatory sites also run a battery, and 10% belong to companies or public bodies rather than private persons. Batteries and heat pumps are where a smart meter pays back through § 14a grid-fee discounts and dynamic tariffs.
Show sites with a battery →
Explorer
Find the gap
Loading the register data…
01
Every district
Mandatory sites estimated to be still without a smart meter, by Landkreis. Per inhabitant and per km² show where a campaign or an installer route reaches most cases; the quota view shows how far the default operators have got. Click a district for its operators.
Estimate: mandatory sites × (1 − default operator’s quota). Population and area: Destatis, 31 Dec 2024.
Source Marktstammdatenregister (BNetzA), export 2026-11-17; BNetzA rollout quotas H1 2026; boundaries © GeoBasis-DE / BKG 2026 (data changed); © Statistisches Bundesamt (Destatis)
02
Districts, ranked
Where the gap is largest, absolute and per inhabitant. The main grid operator and its quota explain why. Click a name to show it on the map.
03
Default meter operators
Every grid operator with mandatory sites in the current view, with its reported quota, the change since the last report and the estimated sites still without a smart meter. Click an operator to filter the page; the B2B view of the same list.
04
Quota over time
Site-weighted quota of the default operators in the current view, each period weighted by today’s mandatory sites (operators that reported in every period).
05
Postcodes
Mandatory sites per postcode for door-to-door, mailing and installer planning. Follows segment, Bundesland, quota band and operator; not the period, battery or owner filters.
Method
How these numbers are built
Sites
Every Monday the job reads the MaStR full export: all solar and battery units in operation, grouped by their location (one location ≈ one metering point), with the grid operator of the connection point. 761,892 sites without a connection point get the main grid operator of their municipality. Balcony plug-in units never count.
Mandatory or optional
Solar above 7 kW (gross, summed per site) or a battery above 4.2 kW commissioned since 2024 makes a site a mandatory case under MsbG § 29 and § 14a EnWG. Smaller solar is optional. Large consumers (over 6,000 kWh a year) and heat pumps or wallboxes are mandatory too but are not in the register, so the radar undercounts them.
Quotas
The BNetzA publishes each default meter operator’s quota every half-year (quarterly until 2025). Each workbook is archived as received, then matched to the register’s grid operators by name: 720 exact, 25 near-identical, 25 reviewed by hand. Matched quotas cover 98% of mandatory sites.
Estimate
Sites still without a smart meter = mandatory sites × (1 − the operator’s quota); where no quota is published, the national site-weighted average (25.2%). The quota is reported for the operator’s consumption cases; generation sites may be equipped faster or slower. Installations by competitive operators are not in the quota.
Data: Bundesnetzagentur, Marktstammdatenregister, export of 17 Nov 2026, licensed under Datenlizenz Deutschland – Namensnennung – 2.0; Bundesnetzagentur, Roll-out-Quoten der Messstellenbetreiber, H1 2026, as reported by the operators and still being checked by the BNetzA. Boundaries © GeoBasis-DE / BKG 2026 (data changed); © Statistisches Bundesamt (Destatis). Scripts: scripts/data/. Built 2026-11-18.
Validation
Checked against the official figure
Our national quota, weighted by mandatory register sites, is 25.2% for H1 2026. The BNetzA reports 26.1% for the same half-year, weighted by the operators’ mandatory metering points (BNetzA). The two weightings differ: register sites cluster in solar-heavy rural areas, metering points in cities, and the BNetzA reports smaller operators to be slower on average.
Glossary
What the labels mean
- Mandatory site
- Sites where the law makes a smart meter mandatory (MsbG § 29): solar above 7 kW, or a battery above 4.2 kW commissioned since 2024 (a controllable device under § 14a EnWG). One site is one location in the register, close to one metering point.
- Without smart meter (est.)
- Estimate: mandatory sites × (1 − the default meter operator’s reported quota). The quota is the share of its mandatory cases it had equipped with a smart meter; where none is published, the national site-weighted average is used.
- Quota
- Share of mandatory installation cases the default meter operator (gMSB) had equipped with a smart meter, as it reported to the Bundesnetzagentur. Excludes optional installations. The legal minimum was 20% by the end of 2025.
- Quota incl. optional
- The same quota counting optional installations too (homes outside the mandatory groups that got one on request).
- Since 25 Feb 2025
- Sites whose newest solar or battery unit went into operation on or after 25 Feb 2025. The law (MsbG § 45) sets 90% of these to be equipped by the end of 2026; for sites from 2018 to Feb 2025 the target is 50% by 2028, and for older ones 90% by 2032.
- Optional
- Solar up to 7 kW (balcony plug-in units excluded) or an older or small battery: no duty, but the owner may ask for a smart meter (yearly cap EUR 60).
- Grid operator
- The grid operator the site is connected to. In almost every area it is also the default meter operator (or part of the same group) whose quota is shown.
- Change
- Quota change over the last reported period, on the same basis (since Q4 2025 BNetzA reports the quota without optional installations).