Tools / Smart meters · Germany
Meter operator lead list
Every default meter operator with mandatory sites in its area, scored as a prospect for metering-as-a-service: how far it is from the legal minimum, how big its backlog is, and how fast it moves. Change the weights to match your own view; every view can be shared as a link or downloaded as CSV.
- Quotas
- H1 2026 (history from Q4 2024)
- Companion
- Smart meter rollout radar
The newest data is days old. This dataset normally refreshes within 10 days, so the automatic refresh may have stalled. Data status
Open data: Download these tables (Parquet, CSV) on Hugging Face
- Below the legal minimum, end of 2025456
operators had equipped less than 20% of their mandatory cases by 31 Dec 2025, the BNetzA’s test for supervisory proceedings ( 434 opened so far; the BNetzA does not name them). 63 were at zero.
- Their backlog27%
of all mandatory solar and battery sites still without a smart meter (estimated 742,460) lie in these operators’ areas.
- Hot leads at default weights105
operators with at least 500 mandatory sites score 60 or more: far from the minimum, a real backlog, slow progress.
Loading the operators…
01
Behind and slow
Each dot is an operator: its quota now (left = further behind) against its gain over the last report (low = slow). Dot size = estimated backlog. Bottom left is where an outsourcing offer meets the most need.
Source BNetzA rollout quotas Q4 2025 and H1 2026; Marktstammdatenregister; EnergyMap analysis
02
Ranked prospects
Sorted by score. Quota at the end of 2025 is the BNetzA’s test date for supervisory proceedings; a value below 20% means the operator is at risk, not that proceedings are confirmed. Click a name for its area on the radar.
Method
How the score works
Regulatory pressure
How far the operator is from the 20% legal minimum: 0 at a quota of 25% or more, full at 0%. Operators without a published quota count half.
Backlog size
Mandatory sites in its area estimated to be still without a smart meter, on a log scale (1,000 sites score about half as much as 1,000,000).
Slow progress
How little the quota rose over the last report: a gain of 10 points or more scores 0, no gain or a fall scores full.
New-build pressure
Share of its mandatory sites commissioned since 25 Feb 2025 (90% of these due by the end of 2026); 30% or more scores full.
Score = weighted average of the four factors, 0 to 100; tiers: Hot from 60, Warm from 40. Default meter operators are matched to grid operators by name (see the radar’s method); an operator’s backlog counts the solar and battery sites connected to its grid, so households over 6,000 kWh and heat pumps are not in it. Cooperations (§ 45 MsbG) report one quota for all members. Seat and website: Marktstammdatenregister, the register’s public company data; contacts are not shown. Quotas are as reported to the BNetzA and still being checked by it.